Aluminium Bahrain B.S.C. announced yesterday that repair operations to its Reduction Line 5 have been successfully completed.
The line suffered damage on April 5 when a power station supplying energy to the line failed. As a result, Line 5 was without power for around three hours. Though production was halted and...